The evolution of Condition-Based Maintenance
What is reactive maintenance?
‘If it isn’t broke, don’t fix it’ is an established maxim many industrial sites still use. However, there are other
approaches to maintenance that can be taken. While this style of maintenance, termed “reactive maintenance”,
has appeal, it also has large risks. Reactive maintenance does not require any upfront or ongoing costs and few,
if any, dedicated personnel.
However, when machinery does break, the impact can be severe and often requires immediate attention. Several
issues can arise from this situation, including limited human resources and significant delays in sourcing replacement
parts. As well as, unexpected downtime costs that can amount to millions of dollars.
The simplest example would be the light bulb – it is only replaced when it blows. On the other hand, it is not a
philosophy that scales well. The larger or more complex the equipment, the greater the consequence of it not
working as it should. A Plant Engineering Maintenance Study indicated that 61% of manufacturing companies
still used reactive maintenance for at least part of their operations.
A scheduled maintenance programme should be specific to an industrial site and all the equipment within it. You can
build this programme using all assets' history data, including maintenance records, breakdown details, and running
performance. This data can also come from the original equipment manufacturer (OEM) for new equipment. The chance
of machine failure as well as the cost of maintenance and repairs will be reduced by this programme.
Jessica (manager) - Online Time 8:30AM-18:00PM
1) Email : sales@mvme.cn
2) WeChat : hu18030235311
3) Skype : jessica01235483
4) Mobile : 86-18030235311
330854-040-24-CN |
|
330104-00-06-10-02-05 |
|
330500-02-04 |
177230-01-02-05 |
|
330105-02-12-15-12-05 |
|
330910-00-13-10-02-00 |
330105-02-12-10-02-00 |
|
330130-085-03-05 |
|
330101-00-14-10-02-05 |
330104-00-16-50-02-00 |
|
330104-00-06-05-02-CN |
|
330101-00-32-10-02-05 |
330106-05-30-10-02-05 |
|
330106-05-30-10-02-CN |
|
330103-06-20-10-02-00 |
330102-00-27-10-02-05 |
|
330103-00-07-05-02-05 |
|
330101-00-13-10-02-00 |
330101-00-27-10-02-05 |
|
330104-00-06-10-02-00 |
|
330854-040-24-CN |
21504-000-008-10-02 |
|
330130-040-01-00 |
|
177230-01-02-05 |
21747-080-01 |
|
22810-00-06-10-02 |
|
330105-02-12-10-02-00 |
330106-05-30-05-02-CN |
|
16710-50 |
|
330104-00-16-50-02-00 |
330930-065-02-00 |
|
330103-00-06-05-02-02 |
|
330106-05-30-10-02-05 |
330130-080-03-00 |
|
330103-00-05-05-02-05 |
|
330102-00-27-10-02-05 |
16710-20 |
|
330104-00-07-10-01-CN |
|
330101-00-27-10-02-05 |
330103-00-04-10-01-00 |
|
330930-045-04-05 |
|
330103-00-03-10-02-05 |
330101-00-20-10-01-00 |
|
330930-065-04-05 |
|
330101-00-14-10-10-02-05 |
330500-02-01 |
|
330103-00-02-10-02-00 |
|
330101-00-20-10-10-02-05 |
330500-00-20 |
|
330103-00-03-10-02-05 |
|
330101-00-30-10-10-02-05 |
330105-02-12-05-02-CN |
|
330101-00-20-10-10-02-05 |
|
330102-20-96-10-02-05 |
330703-000-050-10-11-05 |
|
330101-00-30-10-10-02-05 |
|
330103-00-08-05-02-05 |
330102-00-25-10-02-05 |
|
330102-20-96-10-02-05 |
|
330905-00-08-05-02-05 |
330400-02-00 |
|
330103-00-08-05-02-05 |
|
330905-00-09-05-05-02-05 |
330908-22-31-10-01-05 |
|
330905-00-08-05-02-05 |
|
330906-02-12-05-05-02-05 |
16710-15 |
|
330905-00-09-05-05-02-05 |
|
330907-05-30-10-10-02-05 |
330130-085-00-05 |
|
330906-02-12-05-05-02-05 |
|
330908-00-36-05-02-05-05 |
DCS880-S01-0405-05X0 |
|
330907-05-30-10-10-02-05 |
|
330704-00-050-10-01-05 |
DCS880-S01-0315-05X0 |
|
330908-00-36-05-02-05-05 |
|
330103-00-06-05-02-05 |
DCS880-S02-0250-05X0 |
|
330704-00-050-10-01-05 |
|
330905-00-12-10-02-05 |
DCS880-S02-0050-05X0 |
|
330103-00-06-05-02-05 |
|
330905-05-10-10-02-05 |
Jessica(Sales Manager)
+86 18030235311
Online Time 8:30AM-18:00PM
Copyright Notice © 2004 - 2024 www.mvme.cn All rights reserved